Hi,
i discovered a bug into the scheduler (yes, i work much with him). When i add an object to the sequence list and if this object is in below the limit altitude, the time proposed is very far and always 11:37 pm ((after click on the evaluate button) !!!! But if i add another object in the sequence list, also below the limit, the first object (after click again on the evaluate button) has the good start time and the new object will be starting at 11:37pm.
I tested add two time the same objet (this behavior is reproductibles with two different objects, the limit was fixed to 21°:
Also, il i add more object below the limit and click at last to the evaluate button i have (the limit was fixed to 22°):
you can see the real altitude in the log and some objects are very near to the start limit.
Thakn you.
Christian
i discovered a bug into the scheduler (yes, i work much with him). When i add an object to the sequence list and if this object is in below the limit altitude, the time proposed is very far and always 11:37 pm ((after click on the evaluate button) !!!! But if i add another object in the sequence list, also below the limit, the first object (after click again on the evaluate button) has the good start time and the new object will be starting at 11:37pm.
I tested add two time the same objet (this behavior is reproductibles with two different objects, the limit was fixed to 21°:
Also, il i add more object below the limit and click at last to the evaluate button i have (the limit was fixed to 22°):
you can see the real altitude in the log and some objects are very near to the start limit.
Thakn you.
Christian